|
|
Operation of the Storm Surge BarrierOperating equipment and parking dockUpon closure of the barrier, operating equipment drives the retaining walls out of the parking dock to close the New Waterway. This equipment is operated from control buildings on the north and south sides. The equipment consists of three elements: the operating equipment of the dock-gate, the locomobile and the ballastsystem in the retaining wall. |