Operating equipment - dock-gate
The dock-gate is designed to seal off the
dock. In addition the dock-gate protects
the retaining wall from being run into by
vessels; the gate has been designed in
such a way that vessels scraping the gate
are warded off, while also providing
maximum protection in the event of a head-
on collision. The dock-gate may be
compared with a safe-door (dimensions: 2 m
thick, 12 m high and 20 m long), running
backwards and forwards over a rail. Since
sludge builds up on the rail, the dock-
gate is opened once a month for the sludge
to be bulldozered off.
The dock-gate is opened immediately before
the retaining wall is propelled into the
main stream. Once the retaining wall is back in to its dock
the dock-gate seals off the
parking dock again.
|