Here are some comments with respect to the Bay Networks equipment. * AC Power - 1 120v/20amp Single phase * 1 220v/20amp Single phase * * AC Receptacle Required - NEMA L6-20R Quanity: 1 * NEMA L5-20R Quanity: 1 And probably something to plug a modem (that we will provide) in as well. The modem will be a ZyXel, I have to look up the exact model number. * Circuits - * MCI Ckts Access Ckts * * ---------------- ------------------ * * DS3 (1) DS3 (1) * POTS (1) There should also be a ethernet between a internetMCI router at WTN and the Bay Networks Fair router. James Stewart would have more details. * ACTION: * * o Lara Shahan to send director level approvals to ERPE&I for the * DS3 circuits due to the retail moratorium. * o Lara Shahan to send James Simms the information regarding the * NASDAQ time frame requirements which could have an affect on the * days/time work can be completed. If this becomes issue, Lara * will notify ERPE&I as well. * o James Simms to call and inform Saeideh Nozary or Oliver Hunter * of the bay assignment for the Internet router. * o Nancy Berry will coordinate and confirm with the vendors concerning * their roles in interbay cabling. It was assumed on the call that * connections between the Larsecom and the router will be handled * between the two vendors. Yes. This will be a straight HSSI cable provided by Bay Networks, connecting the Bay router to the Larsecom CSU/DSU. * o Lara Shahan will contact George Loope to determine who will * order the Telco POTS line. * o Once ERPE&I has determined their schedule of events, they will * forward to the "TO"s on these minutes so that Nancy Berry can have * the vendor set up with James Simms an exact date/time to perform * their installations. * o Lara Shahan will schedule a follow-up conference call. The * date/time/call info will be sent out dependent on EPRE&Is schedule * of events. Again, to state my current timelines, installation is expected in January. I will be away from the office until Jan 7th. Shipping and installation of the router will take place sometime between the 8th and the 19th of January. I hope this relieves some of your time constraints if there were any. I will need to know a exact shipping location and onsite contact person for the shipping (2 day Fedex probably). The DS3 from Tokyo via Dominquez (right?) will also come into this rack of equipment correct? If so, a DSU should be planned for this as well. This will be MCI equipment though. It will also connect to the Bay Router with a Bay provided HSSI cable, installation depends on time schedules. I hope this provides you with enough information. If you have any other questions, feel free to call me or send me mail (where the latter is probably faster). Marten Terpstra Bay Networks, Inc. 508 436 8036
Follow-Ups:
[Date Prev] [Date Next] [Thread Prev] [Thread Next] |