|
|
Wetted works - raking out
A good seal was needed between the filter
bed and the sill blocks. This was achieved
by smoothing the top layer of the filter-
bed. To this end a steel device with
vertical teeth was mounted on the mouth of
a dustpan suction-dredger to create a kind
of rake. Following the good results
obtained with a similar method on Neeltje
Jans and in the Petroleum Harbour in the
Europort area, this method was also
applied in the New Waterway.
|