Closure decision
Statistically, the barrier will be closed
once every 2.5 years on average. The closure decision
is taken by an integral computer system,
known as the Decision and Support System
(BOS), which also decides on the closure
of the New Waterway Storm Surge Barrier.
If the barrier needs to be closed,
shipping can use the Hartel Lock, which
has been modified to make this possible.
The movement of the gates is checked every
14 days by sliding them up and down a few
centimetres. This does not interfere with
shipping in any way.
|