Location
The lifting-towers containing the
operating equipment are positioned in the
extension of the Hartel Bridge pillars.
Steel lifting-gates with a span of 49.3
and 98 metres respectively are placed in
the openings created in this way. In the
open condition the gates are raised up,
when the underside is at a level of NAP +
14 metres, a little higher than the bottom
of the Hartel Bridge. When the gates are
closed they have a retaining height of NAP
+ 3 metres.
|